500kW/1075kWh Project in Australia

2025-02-06


ØProject Description: Mining operations are often carried out in remote, dusty environments, and the power demand for mining activities fluctuates with the stage of operation, so customers need a power-saving and economical product to improve the efficiency of their operations. According to the actual situation of the site, we proposed a microgrid power supply system solution for the customer to achieve adaptive energy management, peak shaving and load shifting, which can provide a stable and affordable green power supply for mining operations.

ØLocation/Time: Australia, May 2024

ØConfiguration:PCS: 500kW,BAT:1075kWh.

ØLoad: Mining equipment

ØOperating environment: dusty

ØOperation mode: The system is connected to the grid, which can support off-grid operation, and energy storage is used to adapt to load impact and store energy. 


image.png

Online Message